04 / SERVICES

Specialty electrical engineering services for transit infrastructure.

Three core capabilities — delivered as standalone scopes or integrated into a full design / commissioning package.

S-01Capability 01

Electrical AutoCAD Drafting

Precision drafting aligned with NYCT design standards.

  • One-line, riser, conduit, and panel-schedule drawings
  • NYCT C-Standards & MTA EE-Series compliant layers
  • Coordination with structural, mechanical, and signal teams
  • Revision-controlled DWG / PDF packages
Request Electrical AutoCAD Drafting scope
Electrical AutoCAD Drafting
S-01 · DisciplineMTA · NYCT
S-02Capability 02

As-Built Drawing Creation

Field-verified record drawings — exactly what was installed.

  • On-site verification of conduit, cable, and equipment routes
  • Red-line mark-up reconciliation against contract drawings
  • Closeout submittals accepted by NYCT QA
  • Digital archive in DWG, PDF, and BIM-ready formats
Request As-Built Drawing Creation scope
As-Built Drawing Creation
S-02 · DisciplineMTA · NYCT
S-03Capability 03

Technical Documentation — FAT & SAT

Factory and Site Acceptance Test procedures, results, and closeout.

  • FAT test procedures, traceability matrices & witness reports
  • SAT commissioning scripts for substations, RTUs & SCADA
  • Non-conformance tracking and resolution documentation
  • Final acceptance binders compliant with MTA C&E protocols
Request Technical Documentation scope
Technical Documentation — FAT & SAT
S-03 · DisciplineMTA · NYCT
05 / PROCESSHow we engage

A simple, contract-ready workflow.

STEP 01

Scope Intake

Drawings, specs, RFP language reviewed within 48 hours.

STEP 02

Engineering Plan

Deliverables, revisions, and submittal cadence documented.

STEP 03

Production

Drafting / as-built / FAT-SAT execution with weekly status.

STEP 04

Closeout

Final binder, archive package, and as-built turnover.

FIBER DRAFT
NYCT/MTA Electrical Engineering · Est. 2016

A specialty electrical engineering firm supporting NYCT MTA transit infrastructure — drafting, as-built documentation, and FAT/SAT commissioning packages built to MTA specification.

WBE Certified · CCNA & CCNP (Routing & Switching)

Field Office

© 2026 Fiber Draft. All rights reserved.

Not affiliated with the Metropolitan Transportation Authority.

Made with Emergent